Outdoor site set-up use case

Set out your outdoor site works in a single visit

Signage, bollards, barriers, parking bays and traffic routes appear at real scale on site. You settle the layout with your client on the spot, then leave with the survey report, ready to price.

Site signage and traffic routes projected on the ground of an outdoor area at dusk, with mixed-reality guides.

On the field

What goes wrong on site

Pain 01

The layout gets decided on deployment day

Paper plans and sketches: crews discover access clashes and real footprints on the day of build-out.

Pain 02

Buried services slow the job

Without a scaled view of the ground, traffic routes and equipment foundations can hit unmapped services.

Pain 03

The file is rebuilt at the office

Photos without markers, hand-written dimensions, a sketch: the survey report gets written from memory, often days after the visit.

Linkerman method

How a survey runs

  1. 1Step 01

    Project the set-up onto site

    Signage, bollards, barriers, logistics zones and traffic routes appear at real scale on the outdoor area. Footprints and access clashes are checked in minutes and live.

  2. 2Step 02

    Let your client decide on site

    The client, your engineering consultancy and your partners follow the session live, on site or remotely, and decide with you.

  3. 3Step 03

    Produce the survey report

    Measurements, photos and positions captured during the session feed the survey report directly. You price straight from it, with nothing to re-enter at the office.

Frequently asked questions

What does Linkerman cost for an outdoor site set-up contractor?
€450 excl. VAT per month for the subscription (app and technical support), plus a fee per project depending on the plan: €220, €390 or €550 excl. VAT. You can add the Apple Vision Pro, its case and AppleCare+ for €620 excl. VAT per month, or use a headset you already own.
What hardware do we need to start?
One Apple Vision Pro. Partners and clients follow the session from a browser, with no equipment of their own.
What is in the survey report?
Recorded positions, time-stamped measurements, contextual photos and the information grid filled in during the session, exported to PDF and PowerPoint.

See it run on an outdoor site set-up project.

Someone from the team comes to your offices. You put on the headset, site a piece of equipment yourself and run the survey through to the report.